Electricity in McKinney, TX: Oncor, CoServ, or a Co-op, and How to Set It Up
Some McKinney addresses can shop for an electricity plan in Oncor's area; others get power from a co-op like CoServ. How to tell and how to start service.
Last updated November 21, 2026.
The short version. It depends on the address. In the parts of McKinney where Oncor (or, on the far east edge, TNMP) owns the power lines, you choose your own retail electricity company, and the state's official comparison site is Power to Choose. In areas served by a member-owned co-op, mainly CoServ in west McKinney and Grayson-Collin Electric Cooperative to the north, you sign up with the co-op directly, and there's no plan to shop. A lot of McKinney is mapped to more than one utility, so look up the exact address first. Our utilities checklist does that and gives you the right contact.
Choice areas vs. co-op areas
Texas opened most of its electricity market to competition in 1999. The Public Utility Commission of Texas (PUCT) says cooperatives and city-owned utilities weren't required to join, and that they can opt in only by a board or governing-body resolution. According to ERCOT's November 2025 retail market overview, only two such utilities have opted in: Nueces Electric Cooperative and Lubbock Power & Light. Neither serves McKinney.
What that means at home:
- Choice area (Oncor or TNMP). The wires company owns the poles and lines, reads the meter, and handles outages. You buy the electricity itself from a retail electric provider you choose. Your bill comes from that provider.
- Co-op area (CoServ, Grayson-Collin, and others). The co-op does all of it: the lines, the meter, the power, and the bill. Retail choice isn't available in a co-op's area unless the co-op opts in, so there's no plan to shop. You're a member of the co-op.
Which parts of McKinney get which
The City of McKinney publishes an electric service area map in its open GIS data. We measured it against the city limits on November 21, 2026. Here's the general pattern:
- West McKinney is largely CoServ. About a quarter of the land inside city limits is mapped to CoServ alone, almost all of it on the west side. Address points platted as Craig Ranch, Westridge, and Adriatica fall in CoServ's area. So do some, but not all, of the Stonebridge-named plats.
- The central part of the city is Oncor. About a quarter of city land is mapped to Oncor alone, mostly in the middle of town.
- A large share is mapped to both Oncor and Grayson-Collin. That's about 44% of city land, covering much of central, north, and east McKinney. Address points platted as Tucker Hill and Painted Tree fall here.
- The north is Grayson-Collin. About 5% of city land is mapped to Grayson-Collin alone, in the north. Aster Park and part of Trinity Falls (which is outside city limits) fall here.
- TNMP shows up only in small overlapping slivers on the city's eastern edge.
These are land areas, not household counts, and they come from the city's map, not the utilities' own records. When an address sits in an area mapped to more than one utility, the city's data alone can't tell you which one has the lines to your street. Our utilities checklist flags those addresses and tells you to call with the address before move-in. CoServ also has an interactive service-area map linked from its setup page.
Summit at Westridge is an example of a CoServ address. In the city's map, address points there fall in CoServ's area.
If you're in an Oncor or TNMP area: choosing a plan
You don't sign up with Oncor or TNMP. You pick a retail electric provider, and it arranges service with the wires company. Power to Choose is run by the PUCT, and it says it doesn't recommend any provider or plan. We don't either. Here's what the PUCT tells shoppers to check:
- Read the Electricity Facts Label (EFL). Every plan has one. It shows the plan's pricing, fees, and contract terms in a standard format, so you can compare plans side by side.
- Look for a minimum usage fee. Some plans charge extra if you use less than a set amount in a month. The PUCT says common cutoffs are 500 or 1,000 kWh. The EFL will say.
- Know your contract dates. On contracts with three or more months left, your provider has to send you an expiration notice. If you don't renew or pick a new plan, you can be moved to a month-to-month variable-rate plan.
- Right to cancel. You can cancel a new contract within three business days of receiving your Terms of Service.
- Outages go to the wires company, not your retail provider. In Oncor's area, that's Oncor at 888-313-6862.
The PUCT's consumer hotline is 1-888-782-8477 (1-888-PUC-TIPS), for problems you can't resolve with your provider.
If you're in CoServ's area: starting service
CoServ's residential setup page lists what to have ready and what it charges, as of November 21, 2026:
- Apply online with "Request New Service," or call Customer Care at 940-321-7800 (Monday to Friday, 8 a.m. to 5 p.m.).
- Have ready: the service address, start date, a driver license or state ID, Social Security number, phone number, and date of birth.
- Connection fee: $40 for electric service.
- Deposit: A credit check decides whether you need one. If you do, it won't exceed $300. CoServ says it may waive the deposit if you send a Credit Reference Letter showing 12 months of excellent payment history with a previous utility in the last 24 months.
- Refund: Deposits come back after the account closes or after a run of on-time payments. See CoServ's deposit and refund page for the exact terms.
CoServ also runs a natural gas utility, CoServ Gas, so check who provides gas at your address too.
If you're in Grayson-Collin's area
Grayson-Collin Electric Cooperative asks new members to apply 5 to 7 business days before the date they need service. You can apply online or call 903-482-7100. As of November 21, 2026, GCEC lists:
- A $20 membership fee, refunded when you leave the co-op.
- A $35 transfer or reconnect service fee.
- A $10 soft credit check, to decide whether a deposit is required.
- Renters: everyone named on the lease must be on the application.
After GCEC reviews the application, it emails you about fees and how to pay. It asks for payment within three business days.
Questions people ask
Can I choose my electricity provider in McKinney?
It depends on the address. Homes in Oncor's or TNMP's area can choose a retail electric provider. Homes served by a co-op such as CoServ or Grayson-Collin sign up with the co-op directly.
Who is my electric company in McKinney, TX?
Look up your address on our utilities checklist. It reads the City of McKinney's electric service area data and lists the utility, or utilities, mapped to that spot.
Is CoServ deregulated? Can I switch away from CoServ?
No. CoServ is a member-owned cooperative that hasn't opted in to retail choice. ERCOT's November 2025 overview lists only Nueces Electric Cooperative and Lubbock Power & Light as having opted in. If your address is in CoServ's area, CoServ provides your electricity.
How much is the CoServ deposit?
It depends on a credit check, and CoServ says it won't exceed $300. It may be waived with a Credit Reference Letter. The connection fee is $40. Both figures are from CoServ's site as of November 21, 2026.
How do I start electricity at a new McKinney home?
Find out who serves the address first. In a choice area, pick a plan, using Power to Choose to compare, and sign up with that provider. In a co-op area, apply with the co-op: CoServ online or at 940-321-7800, or Grayson-Collin online or at 903-482-7100, 5 to 7 business days ahead. For the rest of your move-in list, use our utilities checklist or look up any address on our address lookup.